Superconducting rotating electrical machine and manufacturing method for high temperature superconducting film thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8965467
SERIAL NO

13772997

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a superconducting rotating electrical machine and a manufacturing method for a high temperature superconducting film thereof. The superconducting rotating electrical machine includes a stator, and a rotor rotatable with respect to the stator, the rotor having a rotary shaft and a rotor winding. Here, the rotor winding includes tubes disposed on a circumference of the rotary shaft and each forming a passage for a cooling fluid therein, superconducting wires accommodated within the tubes, and a cooling fluid flowing through the inside of the tubes. This configuration may allow for direct heat exchange between the superconducting wires and a refrigerant, resulting in improvement of heat exchange efficiencies of the superconducting wires.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTD22 DOOSANVOLVO-RO SEONGSAN-GU CHANGWON 51711

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Joo, Jin Hong Changwon-si, KR 1 5
Kim, Hyo Jung Changwon-si, KR 58 725
Kim, Yeong Chun Changwon-si, KR 17 37
Kwon, Woon Sik Changwon-si, KR 9 26
Lee, Jae Deuk Changwon-si, KR 5 16
Lee, Jung Hyun Changwon-si, KR 172 840
Lim, Sung Hwan Changwon-si, KR 20 23
Moon, Tae Sun Buk-gu, KR 2 6
Park, Heui Joo Gimhae-si, KR 8 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 24, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00