Film stripping mechanism

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8960255
APP PUB NO 20140130987A1
SERIAL NO

14075110

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A film stripping mechanism, comprising: a base; a platform disposed on the base and having a substrate to be stripped of film placed thereon; a blade disposed above an upper surface of the platform and capable of contacting the substrate to be stripped of film placed on the platform, the platform and the blade being movable relative to each other so as to strip off a film on the substrate to be stripped of film; an automatic alcohol-spraying module contacting the blade for spraying outwards alcohol and allowing the alcohol to flow toward the substrate to be stripped of film along the blade. The film stripping mechanism can improve the yield rate of film stripping and the stripping efficiency, and reduce breakage rate of the substrates.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOE TECHNOLOGY GROUP CO LTD100015 NO 10 JIUXIANQIAO ROAD BEIJING CHAOYANG DISTRICT MUNICIPAL DISTRICT BEIJING CITY 100015
BOE (HEBEI) MOBILE DISPLAY TECHNOLOGY CO LTDNO 5 WEST SIDE JINGKAI RD GU'AN INDUSTRIAL PARK GU'AN HEBEI 065500

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Peng Beijing, CN 915 8951
Meng, Lingmian Beijing, CN 1 8
Sun, Chunpei Beijing, CN 1 8
Wang, Tao Beijing, CN 1447 9693
Xia, Yelei Beijing, CN 3 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 24, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00