Method for operating a forced-flow steam generator operating at a steam temperature above 650°C and forced-flow steam generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8959917
SERIAL NO

13387033

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for operating a forced-flow steam generator operating at variable pressure and at a steam temperature above 650° C. and reducing the minimum forced-flow load of the forced-flow steam generator, wherein the economizer of the forced-flow steam generator includes at least one high pressure pre-heater and/or a heat transfer system for preheating the working medium, the at least one high-pressure pre-heater and/or the heat transfer system arranged upstream as viewed in the working medium circuit direction, wherein if a predetermined partial load point is exceeded, the heat absorption of the working medium within at least one high-pressure pre-heater and/or the heat transfer system is reduced so that the temperature of the water/steam working medium at the outlet of the economizer is below the boiling point relative to the corresponding economizer outlet by a predetermined temperature difference, and a forced-flow steam generator for performing the method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC TECHNOLOGY GMBHSWISS BADEN BADEN AARGAU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berndt, Thoralf Stuttgart, DE 6 13
Chen, Qiurong Backnang, DE 9 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 24, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00