Charged particle cancer therapy beam path control method and apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8957396
APP PUB NO 20110182410A1
SERIAL NO

12994132

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention comprises a charged particle beam path coupling an injector, synchrotron accelerator, beam transport system, targeting system, and/or patient interface method and apparatus. Preferably, the injector comprises: a negative ion beam source, a two phase ion source vacuum system, an ion beam focusing lens, and/or a tandem accelerator. Preferably, the synchrotron comprises turning magnets, edge focusing magnets, magnetic field concentration magnets, winding and correction coils, flat magnetic field incident surfaces, and/or extraction elements. Preferably, the synchrotron, beam transport system, targeting system, and patient interface combine to allow multi-axis/multi-field irradiation, where multi-axis control comprises control of horizontal and vertical beam position, beam energy, and/or beam intensity and multi-field control comprises control of patient rotation and distribution of delivered energy in and about the tumor in a time controlled, targeted, accurate, precise, dosage controlled, and/or efficient manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BALAKIN VLADIMIR YEGOROVICHMOSCOW REGION 142281

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Balakin, Vladimir Yegorovich Moscow region, RU 8 540

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 17, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00