Sheet for solar cell encapsulant and solar cell module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8957304
APP PUB NO 20120048354A1
SERIAL NO

13318540

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sheet for solar cell encapsulant including (A) an ethylene copolymer selected from 1a to 5a; and (B) an ethylene copolymer selected from 1b to 3b, the copolymer (A) having a melting point of 90° C. or higher and containing constituent unit derived from ethylene [1a: ethylene-vinyl acetate (VA) copolymer, 2a: ethylene-acrylate copolymer, 3a: high-pressure method low-density polyethylene, 4a: ethylene-α-olefin copolymer, 5a: ethylene-G(M)A copolymer other than the below-described 1b, 1b: ethylene-G(M)A copolymer, 2b: ethylene-VA-G(M)A copolymer, 3b: ethylene-acrylate-G(M)A copolymer]. In the ethylene copolymer (B), the total ratio of the constituent unit derived from glycidyl(meth)acrylate (G(M)A) is preferably from 2% to 30% by mass. As a result of this, crosslinking treatment is substantially unnecessary, and practical adhesion and adhesion stability are achieved without heat treatment for crosslinking.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOW-MITSUI POLYCHEMICALS COMPANY LTD5-2 HIGASHI-SHIMBASHI 1-CHOME MINATO-KU TOKYO 105-7117

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oogi, Kazuyuki Ichihara, JP 11 56
Sato, Masanobu Tokyo, JP 147 1107

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 17, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00