Solid state power source with frames for attachment to an electronic circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8956712
APP PUB NO 20140154553A1
SERIAL NO

13692729

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power source for a solid state device includes: a first frame having a first contact portion, a first bonding portion and a first extension portion between the first contact portion and the first bonding portion; a second frame having a second contact portion, a second bonding portion and a second extension portion between the second contact portion and the second bonding portion; and a first pole layer, an electrolyte layer and a second pole layer positioned between the first and second contact portions, wherein a first portion of the electrolyte layer is positioned between the first extension and the first pole and a second portion of the electrolyte layer is positioned between the first extension and the second pole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAPURAST RESEARCH LLC1209 ORANGE STREET CORPORATION TRUST CENTER WILMINGTON DE 19801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barror, Michael W Minneapolis, US 8 117
Day, John K Minneapolis, US 17 684
LaGuardia, Alexandra Z Denver, US 3 19
Lytle, Damon E Golden, US 5 20
Neudecker, Bernd J Littleton, US 43 1662
Snyder, Shawn W Golden, US 36 810

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 17, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00