Method for enhancing the yield rate of ball implanting of a substrate of an integrated circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8955735
APP PUB NO 20140339291A1
SERIAL NO

13896393

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is used for implanting solder balls of an integrated circuit by operating a ball implanting machine. The ball implanting machine includes a suction fixture, an evacuating device, two pivoting and inverting devices, a guide plate, a ball carrier, and a substrate. The suction fixture has a plurality of ball grooves. The guide plate has a plurality of guide holes each aligning with a respective one of the ball grooves of the suction fixture. The ball carrier contains a plurality of solder balls. Thus, each of the solder balls is extended through the respective guide hole of the guide plate into the respective ball groove of the suction fixture, so that the solder balls will not protrude outward from the guide plate and will not interfere with or jam each other during movement of the ball carrier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZEN VOCE CORPORATIONNO 53 JINGGONG RD SINFONG TOWNSHIP HSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chao-Shang Hsinchu County, TW 1 3
Lin, Yu-Kai Hsinchu County, TW 55 327

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 17, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00