Wooden building skeleton

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8950126
APP PUB NO 20140090315A1
SERIAL NO

13793360

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The wooden building skeleton of the present invention has excellent quake resistance because the column of a rigid-frame structure joined to a cross member or the foundation so that a bending moment can be transferred therebetween and the load-bearing wall therein exhibit their load bearing ability. A foundation and a wooden column and the wooden column and a beam are respectively joined by two bolts so that a bending moment can be transferred therebetween. A load-bearing wall is also provided between the beam and the foundation. The length of the section of the bolts which undergoes elongation when inter-story deflection occurs between the beam and the foundation or the cross-sectional dimensions of the wooden column is set such that the inter-story deflection which is generated before the wooden column is fractured is almost equal to or greater than the inter-story deflection which is generated before the load-bearing wall is fractured.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO FORESTRY CO LTD3-2 OTEMACHI 1-CHOME CHIYODA-KU TOKYO 1008270

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imai, Junichi Tokyo, JP 43 248
Ishiyama, Hiroki Tokyo, JP 39 66
Nakashima, Hiroki Tokyo, JP 36 227

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 10, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00