Super capacitor structure and the manufacture thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8947853
APP PUB NO 20130083452A1
SERIAL NO

13418342

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a super capacitor and method of manufacture thereof. This invention relates to a solid state super capacitor comprising a solid state polymer electrolyte and a modified carbonaceous electrode. Said modified carbonaceous electrode comprises a conductive carbonaceous material covered with active ingredients. Said modified carbonaceous electrode and said solid state polymer electrolyte are layered on top of each other to form a sandwich-like structure. Said super capacitor performs much better than known super capacitor comprising liquid or gel-form electrolytes. Said super capacitor has higher conductivity, therefore can be manufactured without a current collector. Since said super capacitor contains solid state polymer electrolyte, the method of manufacturing said super capacitor is more environmentally friendly and has a higher safety level.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FENG CHIA UNIVERSITYNO 100 WENHUA RD XITUN DIST TAICHUNG CITY 40724

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Shi-Kun Taichung, TW 8 48
Chiu, Kuo-Feng Taichung, TW 11 36
Ko, Tse-Hao Taichung, TW 37 201

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 3, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00