Pellet press for producing pellets

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8944801
APP PUB NO 20120276237A1
SERIAL NO

13504754

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pellet press for producing pellets from material which is to be compressed. In the pellet press, the biomass is compressed through the holes of the die by at least one press device comprising a roller which rolls on the die, to form pellets. The die and/or the roller move in relation to each other during the production thereof. Provides essential machine elements or modules which are simple to access and also quick to exchange. The construction and operation of the pellet press should be modular so that the production power can be variably adjusted and/or the production is independent of the repairs of individual modules. At least one press device comprising at least one roller and/or the die is arranged inside a press frame in the pellet press, the press frame being embodied in the form of at least one C-frame and/or at least one window frame.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DIEFFENBACHER GMBH MASCHINEN- UND ANLAGENBAU75031 EPPINGEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heymanns, Frank Oberderdingen, DE 5 15
Kroll, Detlef Eppingen, DE 10 87
Natus, Günter Mühltal, DE 3 15
von, Haas Gernot Heidelberg, DE 17 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 3, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00