Equipment for the straightening of deformed electrolysis potshells, in particular for aluminium molten-bath electrolysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8943867
APP PUB NO 20110203340A1
SERIAL NO

12990476

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transportable straightening beam which makes it possible to straighten deformed potshell sidewalls of different deformation resistance independently of one another is disclosed for use both with potshell carrying structure and potshell sheeting. The beam can extend between two potshell walls lying opposite one another. Each of its two end regions has a straightening jaw with a downwardly open U-profile-shaped orifice through which the straightening beam can be positioned onto the top side of the potshell sidewalls. Each straightening jaws being arranged with at least one hydraulic straightening ram parallel to the potshell bottom, and the straightening rams lying along a line of action, and such that one straightening jaw lies opposite the other straightening jaw which is carrying out the straightening work on a deformed potshell wall while being firmly braced with the top side of the potshell sidewall and serving as a captively fixed counterbearing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
REEL GMBH97209 VEITSHÖCHHEIM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagel, Hardy Brühl, DE 2 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 3, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00