Catalyst feed control during catalyst transition periods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8940239
APP PUB NO 20140363340A1
SERIAL NO

14465525

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques are provided for operating a reactor during a catalyst transition period. The instantaneous reaction rate during a catalyst transition period can be determined using real-time measured process variables, and material balance calculations to provide an instantaneous reaction rate in approximately real time. According to certain embodiments, a material balance can be performed on the reactor system using a continuous ideal stirred tank reactor to determine the fractions of each type of catalyst that are present in the reactor, as well as the overall weight percent of catalyst in the reactor. A controller can then calculate the overall instantaneous reaction rate based on the respective catalyst fractions and the overall weight percent of catalyst in the reactor. The catalyst feed rate can then be adjusted based on the determined instantaneous reaction rate to maintain the instantaneous reaction rate within desired limits during a catalyst transition period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHEVRON PHILLIPS CHEMICAL COMPANY LPTHE WOODLANDS TEXAS 77380

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hendrickson, Gregory G Kingwood, US 26 242

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 27, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00