Multi-row tapered roller bearing and transmission having such a bearing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8939651
APP PUB NO 20130202238A1
SERIAL NO

13636354

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bearing assembly includes at least first, second and third raceway elements that are each separable from each other and at least first, second and third rows of truncated-cone-shaped rolling elements. The first and second raceway elements are disposed side-by-side in an axial direction of the bearing assembly and oppoe the third raceway element in a radial direction of the bearing assembly. The first and second rows of rolling elements are disposed between the first raceway element and the third raceway element and the third row of rolling elements is disposed between the second raceway element and the third raceway element. The rolling elements of the first and second rows commonly roll on a first raceway of the third raceway element and the rolling elements of the third row roll on a second raceway of the third raceway element, which is not parallel to the first raceway.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AKTIEBOLAGET SKF41550 GÖTEBORG 415 50

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Olschewski, Armin Schweinfurt, DE 127 1093
Sommer, Joachim Schweinfurt, DE 6 16
Spies, Rainer Donnersdorf, DE 6 15
Stubenrauch, Arno Aidhausen, DE 22 126

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 27, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00