Engineered wood construction system for high performance structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8935892
SERIAL NO

13471528

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A building includes a connection between an engineered wood load bearing element of the building such as a column, beam, or load bearing panel, and another load bearing element or a foundation of the building. At least one tendon ties the load bearing elements or the load bearing element and the foundation together. One or more energy dissipaters, replaceably connected between the load bearing element and/or the foundation, absorb energy when a loading event causes relative movement of the connection. The engineered wood element may be a laminated veneer lumber element, a parallel strand lumber element, or a glue laminated timber element, for example. Typically all of the load bearing elements of the building will be engineered wood elements. The building may be single or multi-storey. The building system enables lightweight low cost buildings, with energy dissipaters which may be replaced after extreme loading. The building may be prefabricated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FPINNOVATIONSPOINTE-CLAIRE QUÉBEC H9R 3J9

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buchanan, Andrew Christchurch, NZ 20 60
Palermo, Allesandro Varese, IT 1 19
Pampanin, Stefano Christchurch, NZ 5 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 20, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00