Method and device for producing semicrystalline polymer material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8932404
SERIAL NO

13320010

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for producing semicrystalline polymer material, wherein the predominantly amorphous raw polymer material, in particular granules, to be treated is introduced into a crystallization reactor (1) and is partially crystallized there by being heated, but without melting, and subsequently the semicrystalline polymer material obtained in such a way is removed from the crystallization reactor (1) and at least part of said semicrystalline polymer material is diverted and mixed back into the crystallization reactor (1) in order to reduce the adhesive tendency of the polymer material. According to the invention, the diverted semicrystalline polymer material is combined and mixed with the raw polymer material before being mixed back into the crystallization reactor (1), and the mixture is then introduced into the crystallization reactor (1).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EREMA ENGINEERING RECYCLING MASCHINEN UND ANLAGEN GESELLSCHAFT M B HFREINDORF UNTERFELDSTRASSE 3 ANSFELDEN 4052

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Feichtinger, Klaus Linz, AT 48 497
Hackl, Manfred Linz-Urfahr, AT 42 406
Roessler-Czermak, Andreas Neuhofen an der Krems, AT 1 0
Weis, Gerald Aschaffenburg, DE 18 89

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 13, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00