Hydrophilic membrane integrated olefin hydration process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8921619
SERIAL NO

13705360

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A membrane-integrated hydration reactor that is operable to produce an associated alcohol product from an olefin using water includes a solid acid olefin hydration catalyst in a production zone and a hydrophilic membrane operable to selectively permit pervaporation of water one-way and not permit pervaporation of the associated alcohol or permeation of the olefin at olefin hydration process conditions in a separations zone. The production zone is operable to form a production zone product mixture made of the associated alcohol and any unreacted water. The associated separations zone is operable to form and produce both the associated alcohol product and a pervaporated water product from the production zone product mixture. A method of olefin hydration for forming an associated alcohol product from an olefin using water uses the membrane-integrated hydration reactor at olefin hydration process conditions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY1 EASTERN AVENUE DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abba, Ibrahim Dhahran, SA 39 146
Harale, Aadesh Abqaiq, SA 55 319
Xu, Wei Dhahran, SA 934 8439

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00