Hopper cars with one or more discharge control systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8915194
SERIAL NO

12816203

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Hopper cars both open and covered and discharge control systems are disclosed. Each hopper car may include at least one hopper and a center sill which defines in part a longitudinal axis of the hopper car. At least one discharge opening may be formed proximate a lower portion of each hopper. A respective door assembly may be pivotally mounted adjacent to each discharge opening to control the flow of lading from the respective discharge opening. Each discharge control system may include a common linkage and associated secondary linkages operable to move associated door assemblies between a first position and a second position. A power source including a motor, an air cylinder or a hydraulic cylinder may be disposed on the railway car to move the common linkage. For other hopper cars a wayside drive system may be releasably engaged with a capstan operable coupled to the common linkage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRN INC2525 STEMMONS FREEWAY DALLAS TX 75207

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barry, Robert J Arlington, US 18 463
Creighton, George S Double Oak, US 27 429
Fetterman, D Bruce Arlington, US 11 336

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 23, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00