Establishing communication between well pairs in oil sands by dilation with steam or water circulation at elevated pressures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8905132
SERIAL NO

13288854

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of establishing fluid communication between a well pair in an oil-sand reservoir, where dilatable oil sands in the reservoir form a barrier to fluid communication between the well pair. Steam or water is circulated within at least one well to a region of the oil sands adjacent to the well. The steam or water pressure is increased to a dilation pressure sufficient to dilate the oil sands in the region. While circulating steam or water within the well at a substantially steady state, the steam or water pressure is maintained at a level sufficient to enlarge the dilated region, until detection of a signal indicative of fluid communication between the well pair. The rates and pressures of steam or water injection and production may be monitored and adjusted to vary a bottom-hole pressure in the well.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FCCL PARTNERSIHP500 CENTRE STREET SE P O BOX 766 CALGARY ALBERTA T2P 0M5

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abbate, Jason P Calgary, CA 1 29
Barber, Chad Calgary, CA 3 30
Elliott, Christopher James Calgary, CA 1 29
Gittins, Simon Bragg Creek, CA 9 46
Popko, Logan Calgary, CA 1 29
Zaman, Maliha Calgary, CA 1 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 9, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00