Method for functionalising a thermoset, crosslinked isocyanate-based polymeric solid material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8901180
SERIAL NO

13470567

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for functionalizing a thermoset, crosslinked isocyanate-based polymeric solid material which is made of isocyanate and isocyanate reactive components, at least one of which comprises an anchor component which has at least one anchor group. The anchor groups on the solid material are formed by terminal alkene and/or alkyne groups. To functionalize this polymeric solid material it is brought in contact with a solution which contains at least one functional component. This functional component comprises at least one thiol group and is allowed to bind covalently to the polymeric solid material by a free-radical addition reaction between the thiol groups on the functional component and the terminal alkene and/or alkyne anchor groups on the undissolved solid material. An effective functionalization of the polymeric material can thus be achieved notwithstanding the heterogeneous reaction conditions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RECTICEL1140 BRUSSEL (EVERE)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Du, Prez Filip Ghent, BE 12 23
Jonckheere, Laura Wetteren, BE 1 0
Nguyen, Thu Ghent, BE 37 463

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00