Apparatus and method for securing preliminary information about database fragments for utilization in mapreduce processing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8892599
APP PUB NO 20140114994A1
SERIAL NO

13659775

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of processing a query in a distributed database implemented across a set of nodes includes receiving a query. The query is divided into split characterization queries. The split characterization queries are distributed to worker nodes. Each worker node stores a partition of the distributed database with encoded textual objects and pre-defined indices characterizing encoded textual object fragments. The split characterization queries are executed at the worker nodes to obtain preliminary information about query results. Executing the split characterization queries includes matching query fragments associated with the split characterization queries with encoded textual object fragments of the pre-defined indices to produce fragment matches representative of the size of the query results. For each split characterization query the preliminary information about query results includes a fragment count, a database partition identification, and a database host name.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PROGRESS FEDERAL SOLUTIONS INC15 WAYSIDE RD SUITE 400 BURLINGTON MA 01803

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Jane X San Carlos, US 3 63
Lindblad, Christopher Berkeley, US 20 794

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 18, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00