Circuit and method of using time-average-frequency direct period syntheszier for improving crystal-less frequency generator frequency stability

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8890591
SERIAL NO

14140016

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A Time-Average-Frequency direct period synthesizer is used to improve crystal-less frequency generator's frequency stability. It includes (a) a temperature sensor circuit to compensate temperature-induced frequency instability; (b) a voltage sensor circuit to compensate voltage-induced frequency instability; (c) a calibration circuit to correct manufacture-related frequency error; (d) a frequency control word update circuit to receive the temperature- and voltage-related frequency adjustments, and the calibration-related adjustment, to generate the corresponding frequency control word in a predetermined schedule; (f) a Time-Average-Frequency direct period synthesizer to receive said frequency control word in the predetermined schedule and produce a clock signal with a frequency that is stable and accurate by counteracting the frequency variation caused by crystal-less oscillators' temperature and voltage dependence and correcting the frequency error introduced in manufacture process. Methods of correcting crystal-less oscillators' frequency error and compensating its frequency variation are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XIU LIMINGPLANO TX

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Xiu, Liming Plano, US 71 565

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 18, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00