Method for making touch panel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8889215
APP PUB NO 20120312772A1
SERIAL NO

13339688

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a method for making a plurality of touch panels one time. The method includes following steps. A substrate is provided. The substrate has a surface defining a number of target areas with each including two areas: a touch-view area and a trace area. An adhesive layer is formed on the surface of the substrate. A carbon nanotube film is formed on the adhesive layer. The adhesive layer is solidified. An electrode and a conductive trace are formed on each target area so that part of the carbon nanotube film is exposed from a space between adjacent conductive lines of the conductive trace to form an exposed carbon nanotube film on each trace area. The exposed carbon nanotube film on each trace area is removed to obtain a plurality of transparent conductive layers spaced from each other. A number of touch panels is obtained by cutting the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HON HAI PRECISION INDUSTRY CO LTD66 CHUNG SHAN ROAD TU-CHENG DIST NEW TAIPEI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Jia-Shyong New Taipei, TW 93 1010
Hung, Hung-Yi New Taipei, TW 8 42
Wu, Jeah-Sheng New Taipei, TW 30 557

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 18, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00