Electrical connector and method of assembling same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8888509
APP PUB NO 20140017913A1
SERIAL NO

13549139

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical connector and method assembling the same. A device may comprise a connector frame, a flexible printed circuit board connected to the connector frame, a filter mounted to the flexible printed circuit board; and at least one terminal mounted to the flexible printed circuit board and in electrical communication with the filter. A method to assemble an electrical connector may comprise: providing a flexible printed circuit board having two conductive pads and a filter in electrical communication with the two conductive pads; connecting each conductive pad to a corresponding terminal; inserting each terminal into corresponding holders in a connector frame; placing the flexible printed circuit board in a curved pathway of the connector frame to form a connector subassembly; and inserting the connector subassembly into a connector housing. The filter may have three electrical connections, two are connected to the terminals and one is connected to ground.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALLIED MOTION TECHNOLOGIES INC23 IVERNESS WAY EAST SUITE 150 ENGLEWOOD CO 80112-5711

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Colwell, Robert Owosso, US 3 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 18, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00