Board-to-board connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8888507
SERIAL NO

13854556

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A board-to-board connector made in the form of the combination of a male connector and a female connector is disclosed to include an electrically insulative connector body including a long rectangular mating part, a receptacle part and a plug part respectively located at two opposite sides of the long rectangular mating part, a recessed receiving chamber defined between the long rectangular mating part and the receptacle part and a recessed mating chamber defined between the long rectangular mating part and the plug part, terminal grooves located at the receptacle part, a positioning protruding member located at the plug part and a recessed mating chamber surrounded by the long rectangular mating part and the positioning protruding member, first conducting terminals respectively mounted in the terminal grooves, and second conducting terminals mounted in the positioning protruding member of the plug part of the electrically insulative connector body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACES ELECTRONICS CO LTDNO 13 DONGYUAN ROAD JHONGLI DISTRICT TAOYUAN CITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chun-Yuan Taipei, TW 157 400

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 18, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00