Method for manufacturing a memory cell, a method for manufacturing a memory cell arrangement, and a memory cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8884352
SERIAL NO

13646797

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a memory cell in accordance with various embodiments may include: forming at least one charge storing memory cell structure over a substrate, the charge storing memory cell structure having a first sidewall and a second sidewall opposite the first sidewall; forming an electrically conductive layer over the substrate and the charge storing memory cell structure; patterning the electrically conductive layer to form a spacer at the first sidewall and a blocking structure at the second sidewall of the charge storing memory cell structure; implanting first dopant atoms to form a first doped region in the substrate proximate the spacer, wherein the first dopant atoms are blocked by the blocking structure; removing the blocking structure after implanting the first dopant atoms; implanting second dopant atoms to form a second doped region in the substrate proximate the second sidewall of the charge storing memory cell structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INFINEON TECHNOLOGIES AG85579 NEUBIBERG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bukethal, Christoph Dresden, DE 5 51
Power, John Dresden, DE 58 1169
Shum, Danny Poughkeepsie, US 26 282
Stiftinger, Martin Stockdorf, DE 8 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 11, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00