Resampling a signal to perform synchrophasor measurement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8872699
APP PUB NO 20130154878A1
SERIAL NO

13326756

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Performing power quality and synchrophasor analysis on a resampled signal. A first signal may be initially received which corresponds to a power system. The first signal may have a plurality of cycles and may have a frequency that varies over time. One or more parameters may be determined from the first signal. Based on the one or more parameters, the first signal may be resampled to produce an even angle signal. Various power quality measurements may be performed on the even angle signal. Similarly, further processing may be performed to perform synchrophasor measurements, e.g., to determine phasor, frequency, and/or rate of frequency change for the first signal. In some embodiments, the resampling processing elements (e.g., circuitry, programmable hardware elements, processors and memories, etc.) may be shared between the two analyses.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL INSTRUMENTS CORPORATION11500 N MOPAC EXPRESSWAY AUSTIN TX 78759

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guo, Qiao Shanghai, CN 4 8
Shi, Yijun Shanghai, CN 19 64
Zhang, Chen Shanghai, CN 745 3564

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 28, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00