Devices, processes and methods for the production of lower alkyl esters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8865080
SERIAL NO

12345470

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of a process for production of biodiesel from a transesterification reaction of alcohol and triglycerides in a multi-zone tubular reactor is disclosed. Alkyl esters and glycerin are formed from reactants in a reaction mixture as the reaction mixture flows through the zones. The zones include an entrance zone, an exit zone, and an intermediate zone between the entrance and exit zones. The zones are characterized by physical properties such as viscosity, density, composition, and flow regime. The entrance and intermediate zones include static mixers that perform structured mixing that increases the conversion and yield. The degree of mixing provided by the mixers is different in the zones to account for differences in physical properties. Additionally, the product stream from the reactor is passed through a coalescer to increase droplet size of a dispersed glycerin phase, facilitating both rapid separation of the glycerin phase from the biodiesel phase, and increased conversion and yield in a decanter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RENEWABLE ENERGY GROUP, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ashley, Tom Michael Prosser, US 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 21, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00