F-connector with integrated surge protection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8858262
APP PUB NO 20140154922A1
SERIAL NO

13693352

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector (200), such as but not limited to a coaxial female F-connector, has an integral surge protector. The F-connector includes a connector body (220) with an extended center conductor lead (215). Attached to the F-connector and substantially surrounding the lead is an inductor, such as a toroid core (300) having windings (315) thereon. In one configuration one end (320) of the windings is attached to the center conductor lead and the other end (325) is attached to an electrical ground. In another configuration that other end is attached to a circuit ground via a capacitor, a power supply, or a biasing circuit. The inductor serves to shunt a surge to ground. A series capacitor is connected between the center conductor lead and an input/output port on an electronic circuit, passes the desired signal, and further helps to prevent a surge from reaching the device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENESIS TECHNOLOGY USA INC1325 CAPITAL CIRCLE NW SUITE A LAWRENCEVILLE GA 30043

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daughtry,, Jr Earl Anthony Lawrenceville, US 8 434
Hodge, Ronald L Flowery Branch, US 14 422

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 14, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00