Methods for manufacturing nonplanar graphite-based devices having multiple bandgaps

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8853061
SERIAL NO

13950175

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for forming a graphite-based device on a substrate having a plurality of zones is provided where the substrate is carbon doped in zones. Each such zone comprises a plurality of dopant profiles. One or more graphene stacks are generated in the doped zones. A graphene stack so generated comprises a non-planar graphene layer characterized by a bending angle, curvature, characteristic dimension, graphene orientation, graphene type, or combinations thereof. A method for forming a graphite-based device on a substrate is provided, the substrate comprising a graphene foundation material and a plurality of zones. The substrate is patterned to form features in the zones. One feature comprises a non-planar surface or at least two adjacent surfaces that are not coplanar. One or more graphene stacks are concurrently generated, at least one of which comprises a non-planar graphene layer overlaying the non-planar surface or the at least two adjacent surfaces.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLAN LLC1245 BRICKYARD ROAD #70 SALT LAKE CITY UT 84106-2599

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Davis, Mark Alan Springville, US 38 341

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 7, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00