Manufacturing process for high performance short ligno-cellulosic fibre—thermoplastic composite materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8852488
APP PUB NO 20050225009A1
SERIAL NO

11005520

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a process for the manufacture of short or discontinuous lignocellulosic fiber in combination with synthetic fiber filled thermoplastic composites, in which the process consists of preferably, defiberization and dispersion of the cellulosic fibers in the thermoplastic matrix, further consolidation and dispersion of the blended thermoplastic composition, further blending of the same with inorganic fibers to get the moldable thermoplastic composition and further injection or compression or compression injection molded under high pressure ranging from 100 tones to 1000 tones and a temperature range from 170 to 210 degree centigrade into composite products. The said composites have a tensile strength of at least 75 MPa and a flexural strength of at least 125 MPa. The invention also relates to the use of the said composites in automotive, aerospace, furniture and other structural applications.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAIN MOHINI MNot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Law, Shiang F Toronto, CA 3 28
Panthapulakkal, Suhara Burlington, CA 3 28
Sain, Mohini M Toronto, CA 6 115

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 7, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00