Method and apparatus for compressed video bitstream conversion with reduced-algorithmic-delay

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8837605
SERIAL NO

11862117

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to converting media bitstreams across different networks in a media gateway without any algorithmic delay, and reduces the computation load within the transmission in the situation where the bandwidth of the outgoing network varies dynamically. A first embodiment of the present invention provides an apparatus and a method for a Reduced-Algorithmic-Delay Media Stream Unit Conversion module which is a light weight Simple Pass-Through operation. A second embodiment of the present invention provides an apparatus and a method for a Reduced-Algorithmic-Delay Video Rate Conversion. An alternative embodiment provides an apparatus and a method for a Smart Pass-Through Operation which involves switching between the Simple Pass-Through and the Rate Converter. The methods and apparatuses provided by the first and second embodiment can be used as a stand alone system, or as part of the module of the alternative embodiment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DILITHIUM (ASSIGNMENT FOR THE BENEFIT OF CREDITORS) LLC1100 LA AVENIDA MOUNTAIN VIEW CA 94043

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heng, Wei Jyh Rohnert Park, US 4 143
Jabri, Marwan A Tiburon, US 52 1684
Wang, Jianwei Larkspur, US 37 897
Zhao, Chengji Penshurst, AU 2 39
Zhou, Wei Novato, US 770 4458

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00