Method for removing asphalt pavement and system for removing asphalt pavement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8834063
APP PUB NO 20090297268A1
SERIAL NO

12225698

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It is intended to allow an asphalt pavement to be peeled off efficiently with a relatively small amount of electric power without generating large vibration and noise, and handled in the form of a block. An electromagnetic induction coil 36 is positioned above an asphalt pavement 22 provided on a copper plate (12) to melt a lower surface of the asphalt pavement 22. Then, a wedge-shaped thermally-conductive peeling member 60 having a peeling layer formed on an upper surface thereof is inserted into a melted layer (74) of the lower surface of the asphalt pavement 22 to peel off the asphalt pavement 22 from the steel plate 12. This makes it possible to peel off the asphalt pavement 22 with a relatively small amount of electric power and handle the peeled asphalt pavement 22 in the form of a block.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GREEN ARM CO LTD2-2 KANDA-OGAWAMACHI CHIYODA-KU TOKYO 101-0052

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harakawa, Kenichi Chiba, JP 11 310
Hayashida, Hidetoshi Chiba, JP 2 21
Takeuchi, Seiichi Tokyo, JP 24 400
Tohyama, Koutaro Tokyo, JP 1 11
Wakabayashi, Shinsuke Tokyo, JP 1 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00