Metal cord, rubber-cord complex and pneumatic tire using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8833420
APP PUB NO 20120199259A1
SERIAL NO

13399382

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Rubber-cord complex 9 having improved wet heat adhesive property between rubber and cord. The rubber-cord complex includes cord 10 comprising drawn plated wire 17 prepared by providing brass plated layer 16E on surface of element wire 15 and drawing the resulting plated wire and rubber 12 vulcanized and bonded to cord 10. The rubber-cord complex 9 has adhesion reaction layer 25 (formed by cross-linking sulfur and copper) between rubber 12 and brass plated layer 16E. Adhesion reaction layer 25 has average thickness of 50-1,000 nm. Interface S between adhesion reaction layer 25 and the rubber has a fractal dimension of 1.001-1.300 in a wet heat deterioration state after being subjected to vulcanization to bond rubber 12 thereto and being held at a temperature of 50-100° C. and a humidity of 60-100% for one hour to 20 days.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aramaki, Keisuke Utsunomiya, JP 47 231
Kodama, Junichi Futtsu, JP 31 100
Miyazaki, Shinichi Kobe, JP 257 2616
Okamoto, Kenichi Itami, JP 83 815
Sakai, Yasuo Utsunomiya, JP 38 285
Sano, Yuichi Utsunomiya, JP 41 80

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00