Lace provided with tubular lace body

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8832913
APP PUB NO 20140007392A1
SERIAL NO

13750236

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In the conventional lace with knobby portions having elastic rubber core, there is difference in degree of stretch between both ends and core of the knobby portion. Therefore, there are a portion that is subjected to heavy stretching force and a portion that is subjected to no stretching force, and when large strain is accumulated at the boundary between the portions subjected to different stretching forces and the strain reaches the limit, the lace ruptures. In order to solve the above problem, we provide a lace provided with tubular lace body of elastic material, comprising knobby portions repeatedly placed at intervals, of which diameter vary depending on tension on the knobby portion in an axial direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TWINS CORPORATIONCHIBA 273-0853
HSIEH TSUNG JENJIN YU LING RD SANG YUAN DONG CHEN DONG GUAN CITY GUANG DONG 523000
YANG LIMING311801 ZHEJIANG ZHUJI PROVINCE DATANG TOWN HO VILLAGE COMMUNITY ZHUJI LIWEI MACHINERY CO LTD SHAOXING CITY ZHEJIANG PROVINCE 311801
OSADA MASAKAZU57 FLOOR TOWER 15 CARRIBEANCOAST TUNG CHUNG HONG KONG 999077

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsieh, Tsung Jen Guang Dong, CN 1 17
Kajiwara, Ryuji Chiba, JP 6 37
Osada, Masakazu Hong Kong, CN 10 141
Yang, Liming Guang Dong, CN 47 241

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00