Container for special materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8826687
SERIAL NO

12736911

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rigid-walled, block-shaped box is internally provided with a compartment arranged adjacent to a vertical wall of the box and having a first chamber with a first window open to the inside of the container and a second window open to the outside, and a second chamber with a third window open to the inside of the container and a fourth window open to the outside. The windows are each provided with a shutter. A mass of phase change material is housed within the compartment between said first chamber and second chamber, for absorbing heat from the air flowing from one chamber to the other chamber when said first window and third window are open and said second window and fourth window are closed, and releasing heat to the air flowing from one chamber to the other chamber when said first window and third window are closed and said second window and fourth window are open.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
A R I S S P A10040 LOMBARDORE TURIN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bellezza, Quater Giorgio San Maurizio Canavese, IT 5 48
Bellezza, Quater Paolo San Maurizio Canavese, IT 5 48
Bellezza, Quater Silvia San Maurizio Canavese, IT 5 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 9, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00