Connector assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8821194
APP PUB NO 20130267126A1
SERIAL NO

13726397

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector assembly includes a connector plug and a connector socket. The connector plug includes an outer surface which includes a first portion and a second portion. The first portion includes a plurality of first plug signal transmitting pins. The second portion includes a plurality of second plug signal transmitting pins. The connector socket includes an inner surface. The inner surface is divided into a first area and a second area by a first insulating portion. The first area includes a plurality of first socket signal transmitting pins. The second area includes a plurality of second socket signal transmitting pins. The connector plug inserts in the connector socket to connect the plurality of first plug signal transmitting pins to the plurality of first socket signal transmitting pins, and simultaneously connect the plurality of second plug signal transmitting pins to the plurality of second socket signal transmitting pins.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HON HAI PRECISION INDUSTRY CO LTD66 CHUNG SHAN ROAD TU-CHENG DIST NEW TAIPEI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chin-Feng New Taipei, TW 63 504
Lin, Tay-Yang New Taipei, TW 59 673
Shih, Chi-Tse New Taipei, TW 16 199

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00