Combustion apparatus and method for combustion control thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8821154
APP PUB NO 20120115093A1
SERIAL NO

12942198

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion apparatus. Combustion means (burner) generates flame by combustion. Air supply means (intake fan) supplies air to the combustion means. Flame current detecting means (FRB) is set at a certain detection position and detects a flame current value included in the flame which is generated by the combustion means. Determination means (control device) determines a distribution where the flame current value that is detected is included for the flame current detecting means. Control means (control device), when the flame current value is not included in a distribution, which is set as normal values, outputs a control command of increasing or decreasing at least one of the supply of the air by the air supply means and the supply of fuel based on a determination result by the determination means.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PURPOSE COMPANY LIMITED201 NISHIKASHIWABARASHINDEN FUJI-SHI SHIZUOKA-KEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwama, Kazushi Fuji, JP 3 84
Mochizuki, Yuichi Fuji, JP 4 60
Naitoh, Katsumi Fuji, JP 12 119
Yamashita, Akihito Fuji, JP 4 93

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00