Pallet construction with multi surface bonding plasticized spray

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8813660
APP PUB NO 20120260832A1
SERIAL NO

13432985

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pallet construction including a plurality of elongate extending and inter-engaging members establishing three dimensional construction with an upper platform supporting surface and a spaced apart and bottom ground supporting surface. A plasticized and environmentally sealing spray overcoat is applied over the members. Additional variants include a plurality of three dimensional and rectangular shaped support elements sandwiched between a first upper plurality of elongated members and a second plurality of lower members. A plurality of inter-engaging and overlapping locations include at least one of reduced thickness or notched locations in order to assemble into a seamless and constant width manner. The members can further exhibit any specified shape and size and can be constructed of any of a wood, steel, aluminum, bamboo, composite plastic, cardboard, foam or concrete/silicate based material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ORIA COLLAPSIBLES LLC70 SOUTH SQUIRREL ROAD UNIT A AUBURN HILLS MI 48326

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Linares, Miguel A Bloomfield Hills, US 164 2004

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 26, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00