Numerical control programming method, apparatus therefor, and program for causing a computer to execute the method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8805562
APP PUB NO 20120029675A1
SERIAL NO

13260076

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A level difference or a uncut portion is prevented from being left between adjoining worked regions without forming any useless worked region. A lathe sectional shape forming unit (222) produces a sheet model of a lathe sectional shape in an X-Z plane on the basis of the solid model of a lathe shape formed by a lathe shape forming unit (220). A first/second step working sectional shape forming unit (227) produces sheet models of the worked sectional shapes of the first step and the second step on the basis of the sheet model of the lathe sectional shape, a step dividing position and an overlap amount. A first step disused shape deleting unit (229) and a second step disused shape deleting unit (230) delete the shape needing no work, from the sheet models of the worked sectional shapes of the first step and the second step.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iriguchi, Kenji Tokyo, JP 48 265
Kamiya, Takashi Tokyo, JP 100 1129
Katano, Hiroshi Nagoya, JP 7 73
Matsubara, Susumu Tokyo, JP 38 276
Matsuura, Mahito Nagoya, JP 8 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00