Method of producing polyolefin microporous membrane and separator for lithium ion battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8802272
APP PUB NO 20130252067A1
SERIAL NO

13901883

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is presented for producing polyolefin microporous membranes which are superior in thermal stability and are particularly useful as a separator for a lithium ion battery. A process including a first step of melting polyolefin resin and mixing together at least melted polyolefin resin, organosiloxane particles including a polysiloxane cross-linked structure and having a spherical or golfball shape with an average particle diameter of 0.01-10 μm and a plasticizer to obtain a melted mixture, a second step of molding this mixture and biaxially stretching molded product to obtain a stretched film and a third step of extracting and removing the plasticizer from the stretched film is carried out, if a membrane having a single film layer is to be produced, to obtain this single film layer and, if a membrane having two or more laminated film layer is to be produced, to obtain the film layers on both outsides.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAKEMOTO YUSHI KABUSHIKI KAISHA2-5 MINATO-MACHI GAMAGORI-SHI AICHI-KEN 443-8611

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Noda, Ippei Gamagori, JP 41 391

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00