Powder coated roving for making structural composites

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8802232
APP PUB NO 20100203329A1
SERIAL NO

12688165

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A powder coated roving material for making structural parts is provided. The powder coated roving includes a bundle of fibers at least substantially coated with a powder coating material. The bundle is formed of a plurality of inner fibers and a plurality of outer fibers surrounding the inner fibers. The size composition maintains the fibers in a bundled orientation during processing and releases the fibers during molding. The size composition includes an epoxy resin emulsion containing at least one surfactant and a solid epoxy resin having an epoxy equivalent weight from about 450 to about 950, at least one epoxy silane coupling agent, at least one non-ionic lubricant, at least one cationic lubricant, and at least one organic acid. In addition, the size composition may have an acetone solubility from about 30% to about 75%. A method of making a composite roving is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OCV INTELLECTUAL CAPITAL LLCONE OWENS CORNING PARKWAY TOLEDO OH 43659-0001

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adzima, Leonard J Pickerington, US 38 333
Hager, William G Westerville, US 23 408
Strait, Michael A Sunbury, US 12 91

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00