Machine and method for homogenizing a bitumen-based mixture with polymer granules

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8801265
APP PUB NO 20100190893A1
SERIAL NO

12526483

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is described a machine for homogenizing a bitumen-based mixture with polymer granules. The machine includes an outer container and a cylindrical sleeve, which is housed within the outer container and is provided with a perforated side wall, on which a plurality of through apertures is obtained, each of the holes comprising a sharp cutting edge. The machine further includes a homogenizer assembly, which is mounted so as to axially rotate within the sleeve in order to rotate about a vertical axis, and is configured so as to displace, during its rotation, at least part of the bitumen-based mixture and the polymer granules along a direction which is substantially tangential to the inner surface of the perforated side wall of the sleeve so as to induce the polymer granules to impact against the sharp cutting edge of the through apertures.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EUROLINE S R LVIA DELL' INDUSTRIA 86 MASERADA SUL PIAVE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fornasier, Antonio San Biagio di Callalta, IT 7 16
Pavan, Alessandro Lanzago di Silea, IT 7 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00