Spring loaded docking mechanism

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8800075
SERIAL NO

13205201

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An improved docking assembly for faucets having a pull-down sprayhead extendable from a spout. The docking assembly generally comprises a receptacle fitted into the spout which is formed with chamfered interior walls. A spring-loaded flexible collet is contained within the receptacle with a degree of sliding freedom for spring-biased travel along the chamfered interior walls of the receptacle, from a first position that allows generous radial expansion of the collet to a second position in which radial expansion is restricted. A quick-connect fitting attached to the pull-down sprayhead moves the collet into its first position allowing radial expansion of the collet. Removal of the quick-connect fitting moves the collet to its second position which restricts radial expansion, inhibiting said removal. Consequently, the pulldown sprayhead may be docked to the spout with considerably less insertion force than the opposite removal force needed to undock the pulldown sprayhead from the spout.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASSA ABLOY AMERICAS RESIDENTIAL INC110 SARGENT DRIVE NEW HAVEN CT 06511

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Shoufeng Xiamen, CN 32 147
van, Leyen Jan Christopher Orange, US 10 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00