Regenerated hydrotreatment catalyst

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8795514
APP PUB NO 20120298557A1
SERIAL NO

13521801

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a regenerated hydrotreatment catalyst regenerated from a hydrotreatment catalyst for treating a petroleum fraction, the hydrotreatment catalyst being prepared by supporting molybdenum and at least one species selected from metals of Groups 8 to 10 of the Periodic Table on an inorganic carrier containing an aluminum oxide, wherein a residual carbon content is in the range of 0.15 mass % to 3.0 mass %, a peak intensity of a molybdenum composite metal oxide with respect to an intensity of a base peak is in the range of 0.60 to 1.10 in an X-Ray diffraction spectrum, and a peak intensity of a Mo—S bond derived from a residual sulfur peak with respect to an intensity of a base peak is in the range of 0.10 to 0.60 in a radial distribution curve obtained from an extended X-ray absorption fine structure spectrum of an X-ray absorption fine structure analysis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JX NIPPON OIL & ENERGY CORPORATION1-2 OTEMACHI 1-CHOME CHIYODA-KU TOKYO 1008162 ?1008162
JAPAN PETROLEUM ENERGY CENTER3-9 TORANOMON 4-CHOME MINATO-KU TOKYO 105-0001

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwanami, Yoshimu Tokyo, JP 13 303
Kimura, Nobuharu Tokyo, JP 2 43
Konno, Souichirou Tokyo, JP 26 142
Sahara, Wataru Tokyo, JP 6 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 5, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00