Power conductor monitoring device and method of calibration

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8786292
APP PUB NO 20120139554A1
SERIAL NO

13312714

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power distribution monitoring system is provided that can include a number of features. The system can include a plurality of monitoring devices configured to attach to individual conductors on a power grid distribution network. In some embodiments, a monitoring device is disposed on each conductor of a three-phase network. The monitoring devices can be configured to measure and monitor, among other things, current and electric-field on the conductors. Methods of calibrating the monitoring devices to accurately measure electric-field are also provided. In one embodiment, a first monitoring device on a first conductor can transmit a calibration pulse to a second monitoring device on a second conductor. The second monitoring device can determine a degradation of the calibration pulse, and use that degradation to calibrate electric-field measurements around the conductor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SENTIENT TECHNOLOGY HOLDINGS LLC4111 EAST 37TH STREET NORTH WICHITA KS 67220

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Parsons, Mark A Colorado Springs, US 11 560

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 22, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00