Regulator for flowering time, transgenic plant transformed with the same, and method for regulating flowering time

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8785724
APP PUB NO 20090126047A1
SERIAL NO

11767193

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a flowering-time and/or stem elongation regulator isolated from rice, which is selected from OsMADS50, OsMADSS1, OsMADS56, OsMADS14, OsTRX1, OsVIN1, OsCOL4 and OsCOLS, a DNA construct containing the regulator, a transgenic plant, a part thereof, and plant cell transformed with the DNA construct, and method to control flowering-time and/or stem elongation using the regulator. In the present invention, the flowering-time and/or stem elongation can be controlled, and thereby, various agricultural benefits obtained.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POSTECH FOUNDATIONPOHANG-CITY KYUNGSANGBUK-DO 790-784
POSCO(GOEDONG-DONG) 6261 DONGHAEAN-RO NAM-GU POHANG-SI GYEONGSANGBUK-DO 37859

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
An, Gynheung Pohang, KR 7 46
An, Suyoung Pohang, KR 3 14
Han, Jong-Jin Pohang, KR 2 3
Han, Min-Jung Pohang, KR 1 3
Jeon, Jong-Seong Pohang, KR 3 9
Jeong, Dong-Hoon Pohang, KR 5 17
Kim, Joonyul Pohang, KR 4 7
Kim, Sung-Ryul Pohang, KR 38 4314
Kim, Young-Ock Pohang, KR 1 3
Lee, Shinyoung Kwangju, KR 2 3
Ryu, Choong-Hwan Pohang, KR 3 3
Yoo, JiHye Seoul, KR 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 22, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00