Rotating mechanism and electronic device with same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8782853
APP PUB NO 20130219661A1
SERIAL NO

13778150

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rotating mechanism for rotatably connecting a first main body with a second main body includes a main gear connected to the first main body, a pair of auxiliary gears connected to the second main body, and a connecting piece. The connecting piece includes a connecting part and a positioning part perpendicularly extending from a middle of the connecting part. The positioning part is located between the pair of auxiliary gears with two opposite ends of the positioning part rotatably connected to the pair of auxiliary gears correspondingly. An end of the connecting part away from the positioning part is connected to the main gear to allow the main gear to contact with the auxiliary gears. The first teeth engage with the second teeth to make the first main body rotate relatively about the second main body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HON HAI PRECISION INDUSTRY CO LTD66 CHUNG SHAN ROAD TU-CHENG DIST NEW TAIPEI
FU TAI HUA INDUSTRY (SHENZHEN) CO LTDAREA B FOXCONN GUANLAN TECHNOLOGY PARK DASAN COMMUNITY GUANLAN SUB-DISTRICT SHENZHEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ge, Hai-Qian Shenzhen, CN 19 161

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 22, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00