Crane jib transition structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8777026
APP PUB NO 20120205336A1
SERIAL NO

13318281

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a crane jib transition structure, including a jib section, a transition section and a supporting structure. The jib section matches with the transition section, and they fixedly connect to each other. The upper end of the supporting structure fixedly connects to the upper end of the side of the jib section. The bottom end of the supporting structure fixedly connects to the bottom end of the corresponding side of the transition section. The middle part of the supporting structure fixedly connects to the connection point between the side of jib section and the corresponding side of transition section. Therefore, the crane jib transition structure can not only achieve the strength of a crane jib transition structure, but also achieve the strength and the overall stability of a crane jib, by using the supporting structure connecting to between the crane jib section and transition section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUNAN SANY INTELLIGENT CONTROL EQUIPMENT CO LTD410100 CHANGSHA ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE HUNAN CITY THE 31 INDUSTRIAL CITY CHANGSHA CITY HUNAN PROVINCE 410100
KUNSHAN SANY MECHANICAL CO LTDHUANCHENG EAST AVENUE KUNSHAN DEVELOPMENT AREA JIANGSU 215300

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Han, Fenglin Shanghai, CN 1 3
Li, Mingqi Shanghai, CN 105 434

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 15, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00