Tri-isotropic (TRISO) based light water reactor fuel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8774344
SERIAL NO

13347923

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a new and unique light water reactor (LWR) nuclear fuel pellet configuration formed using tri-isotropic (TRISO) fuel particles suspended in a metal, metal alloy, or ceramic matrix. The new TRISO LWR pellet would have the same dimensions as those of the standard uranium oxide pellet allowing its use without any change to the physical configuration of the reactor vessel, core internals or fuel assemblies. TRISO type fuels have a proven capability for retaining fission products within the confinement boundary created by the coating material. This robustness is expected to reduce or eliminate fuel failure risk and cost. Replacing standard pellets with TRISO LWR fuel pellets with the same, or higher, energy density can potentially extend the operating cycles of LWRs, reduce the number of fuel assemblies replaced in each refueling, reduce the quantity of spent fuel discharged from reactors, lower operating costs, and reduce radioactive waste.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEUCON TECHNOLOGY LLCATLANTA GA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Danese, Laurence Atlanta, US 3 7
Wells, Alan H Duluth, US 14 148

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 8, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00