Apparatus for shutting off power supply for vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8766472
APP PUB NO 20110109156A1
SERIAL NO

12908084

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for shutting off a power supply for construction equipment or a vehicle driven by an engine, including a power supply, functional electrical devices connected to the power supply, a key switch managing the power supply, and a main relay applying or shutting off the power supply to the functional electrical devices in accordance with the state of the key switch, which includes a manipulation sensing means, a control relay installed between the key switch and the main relay to apply a key switch signal to a driving unit of the main relay if the electricity is not applied to its driving unit and to shut off the key switch signal to the driving unit of the main relay if the electricity is applied to its driving unit, and a controller receiving a manipulation signal from the manipulation sensing means and shutting off the power by driving the control relay if there is no manipulation signal for a predetermined time. If the equipment is not used for a predetermined time, the engine is stopped even under the condition that the engine is being driven, and even if the key switch is in a turned-on state, the power that is supplied to the functional electrical devices can be stably intercepted by the controller.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VOLVO CONSTRUCTION EQUIPMENT HOLDING SWEDEN AB631 85 ESKILSTUNA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Dong Soo Jinhae-si, KR 260 3434

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 1, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00